How We Serve

Laying of Pipes / cables by Horizontal Directional Drilling (HDD) (Trenchless Method) and / Jack Pushing Method by Conventional Method of Pipeline for Oil & Gas Pipelines laying, Electrical Distribution Lines, Sewerage & Fresh Water Lines for Municipalities and Telecommunication Network.

Design & Detailed Engineering of Process facilities, Process Packages, Pipelines, Structures, Piping, Cathodic Protection, HDD Crossings, River Crossings, Road & Rail Crossings etc. besides associated Civil, Structural & Architectural work, Electrical & Instrumentation work, DCS and SCADA systems.

Fabrication, erection, installation and construction of cross country pipelines, City Gas Distribution Systems, Central Gas Gathering and Field Gathering Stations, installation of process packages/vessels/columns, fabrication & erection of plant piping, plant structures, installation of large rotating and static equipment's etc.

Supply of Pipes, Coating, Route Survey, Site Clearing & Grading, Stringing, Welding, NDT Testing, Joint Coating, Excavation, Lowering / Laying, Hydrostatic Testing, Pre-Commissioning and Commissioning of Pipeline System along with associated works

Derusting, Brushing, Cleaning, the external or Internal surface of pipes with sand Blasting and Providing coats of anticorrosive and Non-Toxic Point.Jointing of Steel Pipes & HDPE Pipes by Hydraulic Butt Fusion Welding MachineWe provide complete GPRS solutions Preparation/Installation of Manhole / Splicing Chambers.Complete OFC connectivity solutions for indoor & outdoor applications.Supply of HDFE Pipes / Ducts, PVC Pipes / Ducts of various dimensions as per various Speifications .