AuthorityClientProject NamePipe DetailsCumulative HDD Length (Mtrs.)Financial Year
      
Haldia Perto Chemicals Ltd.Bridge & Roof Co. India Ltd.Jetty Pipe Line Project of HPL at HPL Complex, Haldia24″ + 8″ Dia Steel Pipe1030.002018-2019
18″ + 4″ Dia Steel Pipe350.002019-2020
24″ + 8″ Dia Steel Pipe188.002019-2020
Kolkata Metropolitan Development Authority (KMDA)Larsen & Toubro Ltd.Sewerage Integration Work and Sewerage Treatment Project At Barrackpore355 mm OD HDPE Pipe of 300 m ID228.202018-2019
450mm, 560mm OD HDPE Pipe1513.452019-2020
200 mm + 250mm + 300 mm + 350 mm + 450mm, 560mm OD HDPE Pipe636.002020-2021
Indian Oil Corporation Ltd.Kalpataru Power Transmission Ltd.Paradip – Haldia Pipe Line Project of IOCL10.75″ Steel Pipe + 3.5″ OFC Conduit325.442017-2018
10.75″ Steel Pipe + 3.5″ OFC Conduit926.002018-2019
10.75″ Steel Pipe + 3.5″ OFC Conduit2223.202019-2020
30″ Steel Pipe + 3.5″ OFC Conduit1104.942020-2021
Indian Oil Corporation Ltd.Corrtech International (P) Ltd.Laying of mainline of PHDPL LPG Gas Line Project, Group-B, of IOCL10.75″ Steel Pipe + 3.5″ OFC Conduit1478.422018-2019
Indian Oil Corporation Ltd.Haldia Nirman Projects (P) Ltd.IOCL Pipe line Project at Haldia -Durgapur Section, West Bengal.10.75″ Steel Pipe + 3.5″ OFC Conduit1105.702018-2019
Indian Oil Corporation Ltd.Adorn Infra Energy (P) Ltd.IOCL, PHDPL Project, Group-B, Kalyani Site10.75″ Steel Pipe + 3.5″ OFC Conduit1151.392017-2018
Indian Oil Corporation Ltd.EquinoxIOCL, PHDPL Project, Group-B30″ Steel Pipe + 3.5″ OFC Conduit5842020-2021
Kolkata Metropolitan Development Authority (KMDA)Simplex Infrastructure LimitedSewerage Integration Work and Sewerage Treatment Project At Halisahar28″ Steel Pipe + 3.5″ OFC Conduit594.902020-2021