Authority | Client | Project Name | Pipe Details | Cumulative HDD Length (Mtrs.) | Financial Year |
| | | | | |
Haldia Perto Chemicals Ltd. | Bridge & Roof Co. India Ltd. | Jetty Pipe Line Project of HPL at HPL Complex, Haldia | 24″ + 8″ Dia Steel Pipe | 1030.00 | 2018-2019 |
18″ + 4″ Dia Steel Pipe | 350.00 | 2019-2020 |
24″ + 8″ Dia Steel Pipe | 188.00 | 2019-2020 |
Kolkata Metropolitan Development Authority (KMDA) | Larsen & Toubro Ltd. | Sewerage Integration Work and Sewerage Treatment Project At Barrackpore | 355 mm OD HDPE Pipe of 300 m ID | 228.20 | 2018-2019 |
450mm, 560mm OD HDPE Pipe | 1513.45 | 2019-2020 |
200 mm + 250mm + 300 mm + 350 mm + 450mm, 560mm OD HDPE Pipe | 636.00 | 2020-2021 |
Indian Oil Corporation Ltd. | Kalpataru Power Transmission Ltd. | Paradip – Haldia Pipe Line Project of IOCL | 10.75″ Steel Pipe + 3.5″ OFC Conduit | 325.44 | 2017-2018 |
10.75″ Steel Pipe + 3.5″ OFC Conduit | 926.00 | 2018-2019 |
10.75″ Steel Pipe + 3.5″ OFC Conduit | 2223.20 | 2019-2020 |
30″ Steel Pipe + 3.5″ OFC Conduit | 1104.94 | 2020-2021 |
Indian Oil Corporation Ltd. | Corrtech International (P) Ltd. | Laying of mainline of PHDPL LPG Gas Line Project, Group-B, of IOCL | 10.75″ Steel Pipe + 3.5″ OFC Conduit | 1478.42 | 2018-2019 |
Indian Oil Corporation Ltd. | Haldia Nirman Projects (P) Ltd. | IOCL Pipe line Project at Haldia -Durgapur Section, West Bengal. | 10.75″ Steel Pipe + 3.5″ OFC Conduit | 1105.70 | 2018-2019 |
Indian Oil Corporation Ltd. | Adorn Infra Energy (P) Ltd. | IOCL, PHDPL Project, Group-B, Kalyani Site | 10.75″ Steel Pipe + 3.5″ OFC Conduit | 1151.39 | 2017-2018 |
Indian Oil Corporation Ltd. | Equinox | IOCL, PHDPL Project, Group-B | 30″ Steel Pipe + 3.5″ OFC Conduit | 584 | 2020-2021 |
Kolkata Metropolitan Development Authority (KMDA) | Simplex Infrastructure Limited | Sewerage Integration Work and Sewerage Treatment Project At Halisahar | 28″ Steel Pipe + 3.5″ OFC Conduit | 594.90 | 2020-2021 |